cable length
英 [ˈkeɪbl leŋθ]
美 [ˈkeɪbl leŋθ]
链(英国608英尺,美国720英尺);电缆长度;线长;电线长度
英英释义
noun
- a nautical unit of depth
双语例句
- As a kind of pre-stressed structures, the most important factor of the deviation of the initial shape and initial pre-tension of cable-strut tensile structures is the member length error ( cable length error and strut length error, hereinafter referred to as "length error").
作为一类预应力结构,构件长度误差(即索长和杆长误差,以下简称为长度误差)是造成索杆张力结构初始形态和初始预张力偏差的最主要因素。 - Determination of Control Cable Length of PC Cable-stayed Bridge
PC斜拉桥施工控制索长的确定 - What is the maximum cable length between PC and camera ( s)?
再PC与照相机之间的电缆最长是多少? - In this paper, to avoid the current-contact measurement of the drawbacks, a laser Doppler Effect based on the non-contact cable length measurement is used.
本文针对现行接触式测量所存在的弊端,采用了一种基于激光多普勒效应的非接触式电缆长度测量方法。 - In case the welding machine cannot be placed close to the welding area, enough cable length for both, the welding cable as well as the earth clamp has to be provided.
如果焊机不能置于靠近焊接区,必须提供足够长度的焊接线以及接地夹。 - In the oil and gas field development process, the well depth measured by measuring the length of running cable, but the current cable length measurement mainly by motor and Martin Dyke wellhead two measurement methods.
油气田开发过程中的井深测量是通过测电缆运行长度来实现的,而目前对电缆长度计量主要有井口马达和马丁代克两种计量方式。 - The results of simulation and engineering applications indicate that the wavelet de-noising processing with the decomposition level determined by the adaptive selection algorithm can effectively filter out the noise from the TDR signal and then improve the measuring accuracy of the TDR cable length measurement system.
仿真结果和工程应用结果表明,采用该方法确定的小波分解层数对被测信号进行消噪处理,可以有效的滤除信号中的噪声,提高时域反射电缆测长系统的测量精度。 - Meanwhile, a decision method for determine an unknown cable length also recommend.
同时本文还向大家介绍一下未知电缆长度的电缆长度的简易判定方法。 - The propagation process of pulse wave in the cable and influence of cable length on overvoltage and wavefront time of winding are discussed in this paper.
讨论了脉冲波在电缆中的传播过程以及电缆长度对线圈端的过电压和脉冲上升时间的影响。 - The calculation for construction control of the bridge is made with 3D Bridge program and the unstressed cable length method is used to control the final target status of the bridge in the spacial program.
施工控制计算采用3DBridge进行,并在空间程序上利用无应力索长法控制斜拉桥最终目标状态。